EDMONTON TRANSIT SYSTEM
NLRT Commissioning

I was able to catch a couple examples of commissioning for the NLRT line. The diesel pulled clearance train and other MoW testing occurred at night however. Below will be 2010 and 2011 testing along the line.

Thumbnail Unit # Date Description
2010 March 19, 2014 At the south end of Kingsway/ RAH Station.
2010 March 19, 2014 Crossing 111 Ave.
2010 March 19, 2014 Crossing 111 Ave.
2010 March 19, 2014 Northbound from 111 Ave.
2010 March 19, 2014 At Princess Elizabeth
2010 March 19, 2014 At Princess Elizabeth
2010 March 19, 2014 At Princess Elizabeth
2010 March 19, 2014 Between Kingsway and NAIT Stations.
2010 March 19, 2014 ETS 2010 and 4072. By the time the NLRT extension opened, Kingsway Transit Centre had been relocated.

This page last updated October 2019

Back