Back to the ETS
Back to the SLRT Page

Edmonton's South LRT Extension

SLRT Tunnel and Portal Construction Photos

This page will have photos taken from various locations showing various construction related photos of Edmonton's SLRT extension.


February 2003
Looking towards the future southbound tunnel at the north end of the University Station.

February 5, 2003
Looking northwest from the South side of the University of Alberta hospital.
mrh1.jpg (117975 bytes)
May 3, 2003
Fencing in place for TBM recovery hole.
con1.jpg (145491 bytes)
May 3, 2003
Walls at the SLRT site.

May 10, 2003
Looking south from 87 Ave into the SLRT site.

May 15, 2003
Mole retrieval hole, installing piles.

May 20, 2003
Overhead view of the work taking place on the north side of the Education Car Park.

May 20, 2003
A view of the work to remove the piles where the TBM will have to start digging.

June 4, 2003
Looks like they are driving piles at the location of the mole retrieval hole.

June 4, 2003
Looking north into the portal work site.

June 4, 2003
Another shot looking north into the portal work site.

June 4, 2003
A form for a concrete box waiting for the concrete to be poured. This will be the location of the sump for the tunnels.

June 23, 2003
Base slab construction looking south.

June 23, 2003
Looking north towards the future portal.
base03-99.jpg (163974 bytes)
June/ July 2003
Base slab construction
molehole03-99.jpg (132559 bytes)
June/ July 2003
Mole hole construction.
con09-2.jpg (167492 bytes)
July 2003?
Base slab construction.
con09-3.jpg (148770 bytes)
July 2003?
Base slab construction.
070903-1.jpg (92577 bytes)
July 9, 2003
Looking north in SLRT site.
070903-8.jpg (119381 bytes)
July 9, 2003
Base slab construction.
070903-2.jpg (96135 bytes) 
July 9, 2003
Looking north into SLRT site.
con09.jpg (186220 bytes)
July 2003
Forms to make spaces for laying track.
con09-4.jpg (189881 bytes)
July 2003
Base slab construction.
con09-5.jpg (218519 bytes)
July 2003
Base slab construction.
071403-1.jpg (96995 bytes)
July 14, 2003
TBM and base slab.
train08-09.jpg (176282 bytes)
August 2003
Start of work on retaining walls.


August 11, 2003
Retaining wall under construction.


August 24, 2003
Retaining wall under construction. This view shows the same panel as the previous photo, but in this pic the wall has been poured.


August 24, 2003
A form for a wall ready to be poured.


August 26, 2003
Retaining wall under construction. The wall is the same one in the previous photo, but here the concrete has been poured and is now draped in a cloth with water sprinkling onto it.

con03-09-06.jpg (129912 bytes)
September 6, 2003
Looking south into SLRT site.
slrtcon03-11-09-2.jpg (145897 bytes)
September 11, 2003
Work on retaining walls.
con03-10-30.jpg (157848 bytes)
September 30, 2003
Looking north into the SLRT site at night.
slrtcon03-10-13.jpg (74118 bytes)
October 13, 2003
Looking northwest from the South side of the University of Alberta hospital.
con03-10-26.jpg (158181 bytes)
October 26, 2003
Form for portal in place.
con03-10-26-2.jpg (172715 bytes)
October 26, 2003
Bottom of portal form.
con03-10-26-3.jpg (111611 bytes)
October 26, 2003
Dirt to fill in beside of retaining wall.
con03-10-28.jpg (102164 bytes)
October 28, 2003
Top of the forms for the portal.
con03-10-28-2.jpg (140145 bytes)
October 28, 2003
Forms for the portals.
con03-10-28-3.jpg (113312 bytes)
October 28, 2003
Forms for the portals.
con03-10-28-4.jpg (107292 bytes)
October 28, 2003
Cropped image showing the forms for casting the portals.
slrtcon12-07-03.jpg (103213 bytes)
November 30, 2003
Working to remove temporary tunnel liners.
con03-12-13.jpg (100977 bytes)
December 13, 2003
Looking north into SLRT site with the portals visible.
con03-12-13-2.jpg (95899 bytes)
December 13, 2003
Start of bored tunnel.
con03-12-18.jpg (102135 bytes)
December 18, 2003
Looking south along the east side of the retaining wall.
con04-01-14.jpg (193256 bytes)
January 14, 2004
Start of bored tunnel section .
con04-01-14-2.jpg (104996 bytes)
January 14, 2004
Entrance constructed inside of tunnel.
slrt04-26-04-2.jpg (138600 bytes)
April 26, 2004
Start of both bored tunnels.
slrt04-26-04.jpg (163302 bytes)
April 26, 2004
Wide angle shot of overall portal area.
slrt04-26-04-3.jpg (155057 bytes)
April 26, 2004
These look to be tunnel liners? that will be lowered in to complete the tunnel through to University station.
slrtcon05-20-04-10.jpg (161317 bytes)
May 20, 2004
Work on SB cut and cover.
slrtcon05-20-04-9.jpg (140323 bytes)
May 20, 2004
Work on cut and cover frame for SB line.
slrtcon05-20-04-8.jpg (146831 bytes)
May 20, 2004
Working on cut and cover.
0030.jpg (210698 bytes)
May 20, 2004
Cut and cover at the start of the bored tunnel. 18mm lens.
slrtcon05-20-04-6.jpg (183095 bytes)
May 20, 2004
Cut and cover at the start of the bored tunnel.
slrtcon05-20-04-7.jpg (152866 bytes)
May 20, 2004
Cut and cover being tied in with the SB bored tunnel.
slrtcon05-20-04-3.jpg (270466 bytes)
May 20, 2004
Work on SB tunnel cut and cover section.
0032.jpg (208458 bytes)
May 20, 2004
Work on SB tunnel cut and cover section. 18mm
lens.
slrtcon05-20-04-4.jpg (253371 bytes)
May 20, 2004
Cut and cover tied into the portal entrance.
0033.jpg (184313 bytes)
May 20, 2004
Cut and cover tied into the portal entrance.
18mm lens.
0034.jpg (182531 bytes)
May 20, 2004
Looking north.
18mm lens.
0031.jpg (177832 bytes)
May 20, 2004
Looking north towards bored tunnels.
0036.jpg (159900 bytes)
May 20, 2004
Looking north into worksite.
300mm lens.
0037.jpg (156904 bytes)
May 20, 2004
Looking north into worksite.
300mm lens.
slrtcon05-20-04-11.jpg (140450 bytes)
May 20, 2004
Cement trucks at the TBM recovery shaft helping with installation of the final tunnel liners.
slrtcon05-20-04-5.jpg (141686 bytes)
May 20, 2004
Work on the surface for completing the last few tunnel liners.
0024.jpg (90936 bytes)
May 20, 2004
Looking south into northbound tunnel from University.

0025.jpg (85725 bytes)
May 20, 2004
Looking south into northbound tunnel from University.
slrttreesign.jpg (102309 bytes)
May 20, 2004
Sign advertising replacement of trees removed so that the TBM could be transported back to the launch wall.
 

This page last updated on May 31, 2004

Back to the ETS section