
April
26, 2004
Sigh at north side of future work site, showing the north side of station. |

April
26, 2004 Sign at south side of work site, showing south side of
station. |

April
26, 2004
Looking south from NAJA south entrance before construction starts. |

April
26, 2004
Looking south, south of NAJA south entrance before construction. Note
stumps from trees which have been removed prior to work starting. |

April
26, 2004 Looking north, north of 83rd Ave before the start of
construction. |

April
26, 2004 Looking south, north of 83rd Ave before construction starts. |

April
26, 2004 Looking northeast, north of 83rd Ave towards the U of A
hospital before construction starts. |

April
26, 2004 Wide angle shot looking north, south of 83 Ave before
construction starts. |
|
|