February 1, 2003
Before construction started
|
February 3, 2003
First day of construction |
February 5, 2003
Fence posts going in to fence the site |
February 11, 2003
Fence complete |
February 2003
Installing piles. Minor excavation has also begun.
|
March
2003
Major excavation has stated. |
April 16, 2003
The excavation is coming along nicely where the tunnel portal will be.
Note the light pole which had the fence built around it on 114 St is now
gone! |
May 5, 2003
The snow is back! A large crane is now onsite, as are parts of the TBM. |
May 15, 2003
What snow fell on the 5th is now gone. Hopefully the last of the season.
some I-beams can be seen in front of the crane. |
May 20, 2003
More I-beams have arrived. Future photos will show these beams being
welded into boxes. |
June 4, 2003
The I beam boxes have been lowered into the portal site and 2 sets of
stairs constructed. |
June/ July 2003
The big crane is gone for now! Base slab construction has started. |
July 2003
Outer cover for the TBM on site |
October 22, 2003
Retaining wall construction well underway.
|
December 18, 2003
TBM parts after TBM was moved back to south end of site. Tunnel portals
have been cast.
|
April
26, 2004
The big crane is gone, probably for good, and most equipment for the tunnelling
operation is gone. There are still a few tunnel liners waiting to be
installed or disposed of. |
|
|