TBM Photos |
 May 3, 2003 Some parts of the TBM at the SLRT site.
|
May 3, 2003 Some parts of the TBM at the SLRT site. |
May 3, 2003 Some parts of the TBM at the SLRT site. |
May 3, 2003 Some parts of the TBM at the SLRT site. |
May 10, 2003 Another part of the TBM at the SLRT site.
|
 June 12, 2003 The base that the TBM will be
constructed on.
|
 June 17, 2003 An overall shot showing parts of the TBM on the west side of the SLRT site.
|
 June 17, 2003 A view showing various parts of the TBM
throughout the SLRT site.
|
 June 17, 2003 Closer view of parts of the TBM sitting at the north side of the SLRT site. |
 June 17, 2003 Closer view of parts of the TBM sitting at the north side of the SLRT site.
|
 June 17, 2003 The TBM under construction at the TBM
launch pad.
|
 June 17, 2003 First part of the TBM looks complete now.
|
 June 17, 2003 First part of the TBM looks complete now.
|
 June 17, 2003 First part of the TBM looks complete now.
|
 June 23, 2003 Second part of the TBM nearly complete.
|
 June 23, 2003 Second part of the TBM nearly complete.
|
 June 23, 2003 Second part of the TBM nearly complete.
|
June
23, 2003 Work on the TBM with part of the track for the back up train
visible. |
 June
or July 2003 2
sections of the TBM with all major parts installed. |
 June
or July 2003 First
part of the backup train. |
 June
or July 2003 First
part of the backup train and TBM. |
 June
or July 2003 2
of the covers for the 2 TBM shortly after arriving. |
 June
or July 2003 Lifting a cover for
TBM into SLRT site. |
 June
or July 2003 Lifting a cover for TBM into
SLRT site. |

July 2003
Two halves of TBM head.
|

July 2003
TBM assembly. |

July 2003
Overall shot of TBM |
 July 9, 2003 Work on the
TBM. The conveyor between the TBM
and backup train is partially in place |
 July 9, 2003 Work on the TBM.
The conveyor between the TBM and backup train is partially in place
|
July 9, 2003 TBM backup train seen while looking
south into the SLRT site |
 July
9, 2003 The TBM and its backup train starting to take shape |

July 2003
TBM head |

July 2003
Recently installed conveyor on the TBM backup train |

July 2003
Installing conveyor on TBM backup train |
 July 14, 2003 The TBM with the outer cover on over the head. |
 July 14, 2003 The TBM with the outer cover on over the head. |
 July 14, 2003 The TBM with the outer cover on over the head.
|
 July
14, 2003 Overall shot of TBM. |
 August 10, 2003 TBM seen sitting at night.
|
 August 10, 2003 TBM photographed at night.
|
 August 10, 2003 TBM photographed at
night looking ready to advance into the tangent pile. |
 August 11, 2003 South end of
TBM backup train with loaded segment cars.
|
August 11, 2003 The TBM Train has pushed the loaded segment cars into the backup unit of the TBM.
|
 August 11, 2003 The
loaded segment car has had the platform holding the tunnel liners rotated 90 degrees in order to remove the tunnel
liners and install them.
|
 August
24, 2003 The TBM is pretty much complete and has made its first advances
into the tangent pile. |
 August 26, 2003 The TBM is alive and running as evident from the spoil being thrown off of the conveyor and into a waiting
car. It was officially underway the next day.
|
August 26,
2003
This photo shows the TBM nearly fully into the tangent pile with temporary tunnel liners installed behind it.
| 
September 6, 2003
Completed section of temporary tunnel liners. |

October 22, 2003
The TBM train emerging from the tunnel with the ventilation shaft
visible. |

December 13, 2003
Screw conveyor. |

December 13, 2003
TBM backup train
| 
December 13, 2003
TBM backup train |

December 13, 2003
Part of TBM backup train. |

December 18, 2003
TBM backup train. |

December 18, 2003
Screw conveyor with conveyor from TBM backup train attached. |

December 18, 2003
TBM backup train.
| 
December 18, 2003
TBM backup train. |
|
|
|
TBM Train Photos |
July
7, 2003 2
Locomotives at the site
|
July 7, 2003 2
Locomotives at the site. |

July 9, 2003
Locomotive at the site.
|

July 9, 2003
Locomotive at the site. |

August 11, 2003 Grout car |
August 11, 2003 Loaded
segment car. |

August 26, 2003 Loaded
segment car.
|

August 2003
Unloading muck car. |

August 2003
Unloading muck car. |

August 2003
Unloading muck car. |

August 2003
Unloading muck car. |

August 2003
Unloading muck car. |

August 2003
Unloading muck car. |

August 2003
Unloading muck car. |

August 2003
Empty muck car bin waiting for its first use in Edmonton. |

September 6, 2003
Lifting tunnel segments |

September 6, 2003
Placing tunnel segments on to segment car. |

September 6, 2003
2 locomotives sitting at SLRT site. |
September 9, 2003 Loaded bin, ready to be lifted.
|

September 9, 2003 Loaded bin being lifted. |

September 9, 2003 First bin has been lifted.
|

October 22, 2003 Emerging train. |
October 22, 2003 Train being positioned to lift
bin.
|

October 22, 2003 Lifting 3rd bin.
|

October 22, 2003 Preparing to lift 4th bin. |
October 22, 2003 Returning 4th bin onto
car.
|

October 22, 2003 Loading grout car. |

October 22, 2003 Grout car and another car. |

October 22, 2003 Empty
segment cars.
|

October 22, 2003 Lowering segments for a 1.2m
section of tunnel. |

October 22, 2003 With spoil emptied, grout car
filled and tunnel segments loaded the train is ready to return to the
TBM.
|

October 29 2003 Only a 2 car train emerging. |

October 29 2003 Dumping spoil. |

October 29 2003 Steam rising from just dumped
spoil. This was the day of the first snowfall of the season.
|

October 29 2003 Returning bin to car. |

January 14, 2004
Train waiting to enter backup train.
|

January 14, 2004
Train waiting to enter backup train. |
|
|
|