Edmonton Transit System Kingsway Transit Centre

Opened 1978
Closed June 28, 2014
Location 106 St/ 112 Ave
LRT Lines Served None relocated SE to new LRT Station
Platform Pair of islands
Passenger Access N/A
Park and Ride No

<--1978|1988-->

The Kingsway Transit Centre has had a few variations over the years, with the current version that is tied into the LRT station detailed on a separate page.
The previous versions, detailed on this page, were located in the parking lot of Kingsway Mall (formerly Kingsway Garden Mall).

The first incarnation was at the south end of the mall and was aligned east/ west just north of 112 Ave and was opened sometime around 1978. As this point we only have aerial images showing the terminal.

The second incarnation was built around 1987/88 when the mall was extend further south. The terminal was relocated to be aligned north/ south next to 106 St, just north of 111 Ave. Both of these versions featured basic concrete bus bays and shelters.

This third incarnation saw the second location updated with a new shelter building. Like other transit centres built since 2000, the upgrades to Kingsway included a clock. Unlike all other terminals that received clock towers, the clock was located in a much shorter structure.

On June 29, 2014 ETS opened the Kingsway/ Royal Alex Transit Centre located SE of the former Kingsway Transit Centre, across 111 Ave, over a year ahead of the NLRT extension opening. At that time, the Kingsway Transit Centre would be demolished and simply converted into parking for Kingsway Mall.

Pre-Horizon 2000 trolleybus routes 9, 41, and 42 served Kingsway. Post Horizon 2000 the route 9 short turn NAIT - Downtown and 2 morning peak trippers served Kingsway.

106 St Transit Centre
       
Kingsway looking South from the upper level for the Kingsway Mall parkade.        
106 St Transit Centre With Building
     
New passenger shelter under construction. Note how the passenger platform were just expanded into the bus driveway to allow space for the construction. Kingsway at night when the new structure was still new from the Southside, looking at the squat take on ETS's clock tower.
September 29, 2003
One day after closing, looking NW.
June 30, 2014
Artic passing by the closed transit centre.
June 30, 2014
Looking north on the platform.
June 30, 2014
Looking NE towards the shelter building.
June 30, 2014
Busway and second island looking north.
June 30, 2014
Notice that the transit centre has moved.
June 30, 2014
Looking south from the Kingsway Parkade.
June 30, 2014
Looking overall SE from the Kingsway Parkade.
June 30, 2014
Looking SE towards the shelter building.
June 30, 2014
Clock tower.